Contact us for a free consultation.
+255 759 273 339
hello@kilimanjarotravel.com
Summary
The Shira Route is a scenic path up Mount Kilimanjaro as it starts higher than other routes. It takes about 7 to 8 days, giving hikers plenty of time to adjust to the altitude. The trek begins at Shira Gate and crosses the Shira Plateau with beautiful views of the surrounding landscape. The route then merges with the Lemosho and Machame Routes, passing through spots like Lava Tower and Barranco Valley before reaching Barafu Camp for the final climb to the summit, Uhuru Peak. It’s a quieter route, ideal for those seeking a more remote experience.
In detail:
Day 1: Arrival and Transfer to Shira Camp
Transfer: From Moshi/Arusha to Shira Gate
Hiking Duration: 5-6 hours
Overnight Altitude: ~11,800 ft
Day 2: Shira Camp to Lava Tower
Hiking Duration: 6-7 hours
Overnight Altitude: ~13,000 ft
Day 3: Lava Tower to Barranco Camp
Hiking Duration: 4-5 hours
Overnight Altitude: ~13,044 ft
Day 4: Barranco Camp to Karanga Camp
Hiking Duration: 4-5 hours
Overnight Altitude: ~13,106 ft
Day 5: Karanga Camp to Barafu Camp
Hiking Duration: 3-4 hours
Overnight Altitude: ~15,331 ft
Day 6: Summit Day! Barafu Camp to Uhuru Peak and Descent to Mweka Camp
Hiking Duration: 6-7 hours to summit, 6-9 hours down
Overnight Altitude: ~10,500 ft
Day 7: Mweka Camp to Mweka Gate
Hiking Duration: 3-5 hours
Transfer: Back to Moshi or Arusha